Project Name-


Construction of 433.64 m long P.C. Girder Bridge at Keshobpur near Bagerhat Town over River Bhairab (Munigonj Bridge) under Bagerhat Road Division during the year 2002-2003.
 

Client-

Roads & Highways Department
Ministry of Communication
Government of Bangladesh

Project Cost in Million-

BDT 282.75
(Equivalent to USD) 5.44

Salient Feature-

• Pre-stressed concrete girder & RCC bridge
• Approach road
• Earth work , Flexible pavement work
• Asphalt concrete work
• River training & bank protection work
• Length of Bridge – 433.64m
• Width- 9.50m
• Nos. of span- 10 Nos.
• Nos. of P.C. Girder- 50 Nos.
• Nos. of pier – 9 Nos.
• Piling work:
i) Land base pile (900 mm, 1000mm & 1200mm
dia, 37m, 40m & 49m long cast-in-situ bored pile)
ii) Water base pile by berge mounted rig
(1200 mm dia, 49m long cast-in-situ bored pile)
iii) Total Nos. of Pile – 13 Nos.
• Temporary jetty for pre-stressing work
• Abutment – 2 Nos. & counterfort type
.