Project Name-


Construction of 521.23m long Pre-stressed Concrete Girder Bridge (Tailerdeep Bridge) at 23rd k.m. of Patiya-Anwara-Banshkhali-Toitong Road under Dhohazari Road Division.

Client-

Roads & Highways Department
Ministry of Communication
Government of Bangladesh

Project Cost in Million-

BDT 432.04
(Equivalent to USD) 7.96

Salient Feature-

• Pre-stressed concrete girder & RCC bridge
• Approach road
• Piling work :
  i) Land based pile (750 mm dia 30m long cast-in-situ bored pile)
  ii) Water based piling by barge mounted rig (1000 mm dia 35 m long cast-in-situ bored pile)
  iii) Total Nos. of pile 173 Nos.
• Temporary jetty for pre-stressing work
• Length of bridge 521.23m
• Width 9.5m (2 lane)
• Nos. of span 12 Nos.
• Nos. of PC girder 60 Nos.
• Nos. of pier 11 Nos.
• Abutment 2 Nos. & counterfort type